The Works Department is one of the core departments of the District Assembly. Its key functions is to administratively advice, guide and participate in any function that management may deem necessary to engage the staff of the works department and this is done within the framework of the rules and regulations binding the particular activity.
To this end,, for delivery standards the works department is structured administratively as illustrated in the organogram below :
For each of the functional areas to be seen with regards to how they perform, each unit is discussed as follows:
PROJECTS
This unit provides all the basic design, surveys working and structural drawings as might be needed for the initiation process, sourcing and procurement of works and their implementation. Works after they are procured are thus either executed by a contractor under the supervision of staff of the works department, otherwise in case of direct labour works they are handled directly under the supervision of staff of the works department.
ROADS
This normally comes under the roads unit specifically, feeder roads. Here also, initial survey works are normally carried and mapping then takes place. Sometimes, selected footpaths which links various communities are chosen to be upgraded to feeder roads. When sources of funding are identified, procurement processes are then undertaken and the contract awarded for the feeder roads to be constructed.
Sometimes , existing ones are contracted to be reshaped or regraveled , thus the routine as well as periodic maintenance and new works come under the direct supervision of the staff of the roads unit of the works department.
DEVELOPMENT CONTROL
This is the unit which ensures that all developments in the district be it assembly project or those intended by the general public are done in an orderly manner conforming to build standards codes and regulations. These are done through supervision and application of professionalism. These normally go through the permit delivery process when it comes to development to be undertaken by the general public.
ESTATE MANAGEMENT
The estate is one of the units under the department which undertakes procurement for the supply of essential materials for the assembly. Its developments such as repair, renovation works and replacements of obsolete parts are undertaken.
WATER SECTION
This is the least development unit of the works because of the existence of Ghana Water Company Limited. However, when it comes to the provision of potable water to deprived communities the assembly issues contracts for boreholes to be constructed for domestic and for sanitary purposes.
-
CHIPS COMPOUNDCONSTRUCTION OF CHIPS COMPOUND AT TAMATOKU
-
SIX SEATER WCCONSTRUCTION OF SIX SEATER WC AT ADONORKOPEY ADA
-
SIX UNIT CLASSROOM BLOCKCONSTRUCTION OF SIX UNIT CLASSROOM BLOCK AT ADA SHS, FUNDED BY DR DZANIE,CEO IDEAL FINANCE
-
THREE UNIT CLASSROOM BLOCKCONSTRUCTION OF THREE UNIT CLASSROOM BLOCK AT AZIZANYA DA SCHOOL
-
TOURIST RECEPTION CENTRECONSTRUCTION OF TOURIST RECEPTION CENTRE
-
MECHANISED BOREHOLECONSTRUTION OF MECHANISED BOREHOLE AT KASSEH (1)
-
MECHANISED BOREHOLECONSTRUTION OF MECHANISED BOREHOLE AT KASSEH (2)
-
STEEL BRIDGECONSTRUTION OF STEEL BRIDGE AT LUHUESE
-
HEADMASTER BUNGLOWHEADMASTER BUNGLOW AT ADA SENIOR HIGH SCHOOL
-
WATER PURIFICATION MACHINEINSTALLATION OF WATER PURIFICATION MACHINE AT ISLAND COMMUNITIES
-
WATER PURIFICATION MACHINEINSTALLATION OF WATER PURIFICATION MACHINE AT ISLAND COMMUNITIES
-
DISTRICT CIRCUIT COURTREHABILITATION OF ADA DISTRICT CIRCUIT COURT
-
DISTRICT CIRCUIT COURTREHABILITATION OF ADA DISTRICT CIRCUIT COURT
-
MINI GRID SOLAR SYSTEMCONSTRUCTION OF MINI GRID SOLAR SYSTEM AT PEDIATORKOPE AN ISLAND COMMUNITY
-
MINI GRID SOLAR SYSTEMCONSTRUCTION OF MINI GRID SOLAR SYSTEM AT PEDIATORKOPE AN ISLAND COMMUNITY
-
GREEN HOUSECONSTRUCTION OF GREEN HOUSE TOMATOES RESEARCH CENTRE (1)
-
CHIPS COMPOUNDCONSTRUCTION OF CHIPS COMPOUND AT PUTE
-
-
MINI-GRID SOLAR SYSTEMCONSTRUCTION OF MINI-GRID SOLAR SYSTEM AT ISLAND COMMUNITIES(1)
-
TEACHERS BUNGLOWTEACHERS BUNGLOW AT ADA SENIOR HIGH
-
CHIPS COMPOUNDCONSTRUCTION OF CHIPS COMPOUND AT TAMATOKU
-
COTVET FACILITIESCONSTRUCTION OF COTVET FACILITIES AT ADA TECHNICAL INSTITUTE (2)
-
COTVET FACILITIESCONSTRUCTION OF COTVET FACILITIES AT ADA TECHNICAL INSTITUTE (3)
-
GREEN HOUSECONSTRUCTION OF GREEN HOUSE TOMATOES RESEARCH CENTRE (1)
-
GREEN HOUSECONSTRUCTION OF GREEN HOUSE TOMATOES RESEARCH CENTRE (2)
-
INSTITUTIONAL LATRINECONSTRUCTION OF INSTITUTIONAL LATRINE AT ELAVANYO DA SCHOOL
-
MINI GRID SOLAR SYSTEMCONSTRUCTION OF MINI GRID SOLAR SYSTEM AT PEDIATORKOPE AN ISLAND COMMUNITY
-
FEEDER ROADREHABILITATION OF LUFENYA - GBALEKOPE FEEDER ROAD (2.4KM) FUNDED BY GSOP